Site of future Animated Tank Erection
-
Fast Track
-
Time is money and every project has it's deadlines and delay penalties.
The Aquastore Tank Systems can be delivered to your project in a 6 to 8 week period. The
glass coated tanks are erected with the portable A.O. Smith proprietary jacking system.
The factory glass-fused-to-steel 9'x5' tank panels are bolted together using impact
wrenches at ground level. After a ring of sheets has been completed the electric powered
jacking system raises the tank in position for the next ring to be added. It is all
constructed at ground level! No scaffolding, no elevated platforms or concrete form work.
|


|
-
EDGECOATINGTM
After the panel sheet edges have been mechanically rounded, the sheet edges are flame sprayed with a
stainless steel alloy and then glassed for maximum protection.
|
 |
|